Project Two.

A 2019 Orange County complete Primary Bathroom remodel. The shower was cramped and small, while the bathroom vanity was too low and wasted precious bathroom space.

The newly-designed bathroom included a shower that spanned the entire length of the bathroom, a floating double vanity, and beautiful stone tiles on the shower walls and floor.

Previous
Previous

Project One

Next
Next

Project Three